Just before Christmas had a look at Scrivener Dam at a more sedate water level.  I'll have to go back again later in summer when things are a lot drier and so some more comparison shots..

However when I went to compare one of the pics, I realised I never actually posted photos of the flooding on December 9!!  What a fail!!

So.  December 9.  Googong Dam was testing out its new spillway in stylish fashion.  Half of Queanbeyan was under water.  The Molonglo was filling Lake Burley Griffin to overflowing.  They opened four of the gates on Scrivener Dam.  Tonnes and tonnes of dead trees filled the lake and also went over the dam.

It was a pretty epic day.  DC and I and CB 1&2 went down at lunch time to try and get a closer look, but they'd blocked off all the roads to the dam in anticipation of opening all five gates.  Turned out they didn't, which was good, cause I'd have been mad if they had and I couldn't get photos ;)  We all went back after work when they'd opened the roads again (along with most of the rest of Canberra heh).

So here's some pics of Scrivener Dam and the Molonglo on December 9.

Under the Tuggeranong Parkway
Molonglo River in flood

Parts of the bike path were under water!
Molonglo River in flood

Look how thick the wall of water is!
Scrivener Dam

It was really stinky down here.  The Queanbeyan sewage treatment works had been inundated, and partially treated sewage was flowing through the lake and over the dam.
Scrivener Dam

Look how high the water got!  There's a pic later on showing lower water levels for comparison.
Scrivener Dam

Half of Canberra came to have a look
Management station

There are trees in the middle of all that that are completely submerged
Molonglo River in flood

So many dead trees (and some live ones) were washed over
Dead trees flowing over the dam

The dam with three gates open
Scrivener Dam

So much water!
Scrivener Dam

More trees
Scrivener Dam

And some night shots just for fun
Scrivener Dam by night

Scrivener Dam by night


So skip ahead to December 23.

The dam was still very full - water was lapping over the edge!
Scrivener Dam

See that small sign at the base of the nearest vertical bit?  That's where water was up to on December 9 (see pic above)
Scrivener Dam

Scrivener Dam

Even this level looks pretty high.  Will have to go back at the end of February..